604-575-7069 info@totalbuild.ca

Location: Burnaby, B.C.
Owner:
SFU
Value: $1.2m
Timeline: Summer 2014 – Fall 2016

The Simon Fraser University contracted Total Build to replace the pre-cast concrete stairs at SFU’s Burnaby campus. Project hurdles included coordinating construction with class times and ongoing student activities so that Total Build did not disrupt school schedules. Total Build’s experienced crane rigger, concrete placers and finishers completed the job on time. Total Build also performed foundation and bank stabilization to meet the structural engineering requirements. The project was performed in three phases that began in July 2014 and came to a close in November 2016.