Location of Project: Surrey, B.C.
Contract Owner: Mainroad Infrastructure Maintenance
Timeline: August 2014 – October 2014

Total Build completed the installation of the Port Mann Bridge Exterior Inspection Platforms which allow bridge technicians to inspect the connections as required.  The work zone was located between the Eastbound and Westbound traffic lanes posing a project challenge.  Rope Access Technicians (RATs) were used for certain aspects of this job.

The Total Build team are solution based thinkers.  Much time and effort was invested into Fall Protection Engineering requirements for this project ensuring optimal safety and COR compliance for all works. This project was completed in October 2014.