Location of Project: Port Moody
Timeline: June 2016 – July, 2016

MRC Total Build’s project scope included:

  1. Partial depth concrete demolition of the deck slab locally around the piers
  2. Removal of existing joint armor
  3. Casting new concrete link slabs
  4. Slotting of bearing plate bolt holes at both abutments
  5. Cutting of bearing plates at the east pier (east face) and installing bearing stopper at both piers
  6. Installing dowels and casting a concrete extension to the bearing plinths at the abutments
  7. Traffic Management throughout construction
  8. Decommissioning of bridge deck heating coils
  9. Environmental monitoring and protection