MRC Total Build was contracted by the BC Ministry of Transportation and Infrastructure to perform the construction of a mobile weigh scale site located on Highway 7B (Maryhill Bypass) in Port Coquitlam. The project included the widening of the existing highway to make room for a CVSE pull-out. The project included excavation, grading and asphalt works while the highway remained open. Night work and single lane closures were required to transport equipment and materials to and from site. The project was completed on time and on budget in July 2017.