Location: Mission, B.C.
Owner:
BC Hydro
Value: $500k
Timeline: Fall 2016 – Winter 2017

MRC Total Build was contracted by BC Hydro to perform the Removal, Supply and Installation of approximately 80 metres of trail bridges and 2 km of trail improvements at Hayward Lake in Mission. Due to the remote location of the lake, this project required the use of a boat and barge to move all materials, equipment and crew to site each day.