604-575-7069 info@totalbuild.ca

Location of Project: Campbell River, B.C.
Timeline: March 2015 – April 2015

Total Build was contracted to perform the engineering and installation of a 150 ft. Acrow Access Bridge for the John Hart Generating Station Replacement project located in Campbell River, British Columbia. Kevin Breti will be managing this project with Rob Esau as Superintendent and Ben Bose as Foreman with his crew.  This Total Build team worked on the Port Mann Bridge and many other successful bridge-related projects.  This project is anticipated to last about a month.